2026 EBS pollock assessment workspace

Current records, operational model lineage, and comparison plan

Current status

Important

The 2026 assessment remains an operational full-assessment workspace, not a completed assessment. Its accepted operational anchor is the 2024 Model 23 assessment. There was no operational assessment in 2025; CIE-response and software-translation work conducted during 2025 is development evidence, not accepted 2025 management advice.

The tracking records were last reviewed on 2026-08-07. The summary below is generated from the same records used by the assessment dashboard, so the overview and dashboard do not maintain separate status counts.

Table 1: Current 2026 assessment tracking status.
Record status Count
Located; needs checking 7
Ready for assessment use 0
Awaiting delivery 5
Open review decisions 8
Model runs planned or underway 9
Parallel implementations in development 1

Located; needs checking means a possible input has been found but its owner, version, units, processing, and suitability have not all been confirmed. It does not mean the input is accepted for an assessment run. No data source is currently recorded as ready for assessment use.

Use these pages and records for the current details:

Review and delivery schedule

The dates below come directly from the 2026 schedule record. A date containing TBD is not a confirmed meeting or freeze date.

Table 2: Recorded milestones for the 2026 assessment cycle.
Milestone Target Purpose Status
inventory_start 2026-07-17 Document model history and candidate data inventory active
sporc_september_package 2026-08-25 Complete the SPoRC near-exact bridge package for the September review active
september_data_freeze 2026-09-TBD Freeze inputs for early September draft planned
september_draft 2026-09-TBD Review bridge, model set, diagnostics, and preliminary results planned
november_data_freeze 2026-11-TBD Freeze final assessment inputs planned
november_final 2026-11-TBD Final assessment review and recommendation planned

Recorded model implementations

This table is generated from the model-implementation record. Comparison labels describe the current bridge evidence; they do not establish an operational model choice.

Table 3: Parallel model implementations and their recorded bridge status for the 2026 review cycle.
Software Comparison Status Due Review role
RTMB exact_fixed_parameter validated not_applicable Supporting evidence for a future matched annual comparison
Rceattle close_fitted documented not_applicable Supporting evidence for a future matched annual comparison
SPoRC near_exact working 2026-08-25 Parallel model variant for the September 2026 review

Recorded operational run sequence

The following table is generated from the model-run record. TO_CONFIRM and local-only paths remain visible because the exact source configuration or public archive has not yet been established.

Table 4: Recorded 2026 operational model runs and their scientific roles.
Run Role Parent Purpose Status
bridge_2024 reproduction none Reproduce accepted 2024 results planned
bridge_2025_cie development_bridge bridge_2024 Establish development lineage only; not 2025 advice planned
bridge_2026_data data_bridge bridge_2024 Separate data effects from method effects planned
base_2026 candidate_base bridge_2026_data September candidate planned
base_2026_nov final_candidate base_2026 November candidate planned
retro_2026 retrospective base_2026_nov Diagnostic planned
profile_2026 profile base_2026_nov Diagnostic planned
mcmc_2026 mcmc base_2026_nov Diagnostic planned
projection_2026 projection base_2026_nov OFL, maximum ABC, and scenarios planned

Current evidence limits

  • Candidate 2025 inputs are located but still need provenance and suitability checks before assessment use.
  • The exact September 2025 post-CIE source document and configuration remain to be confirmed and enumerated.
  • The 2026 survey products and current-year catch snapshots remain pending or need confirmed delivery dates.
  • The exact RTMB, close Rceattle, and near-exact SPoRC bridges use separately controlled comparisons; none establishes updated-data multi-model equivalence.
  • The SPoRC bridge script, exact paired ADMB reference, checksums, and numerical tolerances remain pending for the August 25 review package.
  • No September or November candidate, diagnostics package, projection result, OFL, or ABC recommendation is presented as complete on this page.

These limits are deliberate provenance controls. As records are validated, the dashboard and this overview will update from the same source tables.