| Record status | Count |
|---|---|
| Located; needs checking | 7 |
| Ready for assessment use | 0 |
| Awaiting delivery | 5 |
| Open review decisions | 8 |
| Model runs planned or underway | 9 |
| Parallel implementations in development | 1 |
2026 EBS pollock assessment workspace
Current records, operational model lineage, and comparison plan
Current status
The 2026 assessment remains an operational full-assessment workspace, not a completed assessment. Its accepted operational anchor is the 2024 Model 23 assessment. There was no operational assessment in 2025; CIE-response and software-translation work conducted during 2025 is development evidence, not accepted 2025 management advice.
The tracking records were last reviewed on 2026-08-07. The summary below is generated from the same records used by the assessment dashboard, so the overview and dashboard do not maintain separate status counts.
Located; needs checking means a possible input has been found but its owner, version, units, processing, and suitability have not all been confirmed. It does not mean the input is accepted for an assessment run. No data source is currently recorded as ready for assessment use.
Use these pages and records for the current details:
- dashboard: schedule, data readiness, run status, decisions, and deliverables;
- working SAFE draft: the developing assessment narrative;
- data-source records: delivery and validation evidence; and
- model-run records: operational run ancestry and review role; and
- model-implementation records: RTMB, Rceattle, and SPoRC bridge evidence and review roles.
Review and delivery schedule
The dates below come directly from the 2026 schedule record. A date containing TBD is not a confirmed meeting or freeze date.
| Milestone | Target | Purpose | Status |
|---|---|---|---|
| inventory_start | 2026-07-17 | Document model history and candidate data inventory | active |
| sporc_september_package | 2026-08-25 | Complete the SPoRC near-exact bridge package for the September review | active |
| september_data_freeze | 2026-09-TBD | Freeze inputs for early September draft | planned |
| september_draft | 2026-09-TBD | Review bridge, model set, diagnostics, and preliminary results | planned |
| november_data_freeze | 2026-11-TBD | Freeze final assessment inputs | planned |
| november_final | 2026-11-TBD | Final assessment review and recommendation | planned |
Recorded model implementations
This table is generated from the model-implementation record. Comparison labels describe the current bridge evidence; they do not establish an operational model choice.
| Software | Comparison | Status | Due | Review role |
|---|---|---|---|---|
| RTMB | exact_fixed_parameter | validated | not_applicable | Supporting evidence for a future matched annual comparison |
| Rceattle | close_fitted | documented | not_applicable | Supporting evidence for a future matched annual comparison |
| SPoRC | near_exact | working | 2026-08-25 | Parallel model variant for the September 2026 review |
Recorded operational run sequence
The following table is generated from the model-run record. TO_CONFIRM and local-only paths remain visible because the exact source configuration or public archive has not yet been established.
| Run | Role | Parent | Purpose | Status |
|---|---|---|---|---|
| bridge_2024 | reproduction | none | Reproduce accepted 2024 results | planned |
| bridge_2025_cie | development_bridge | bridge_2024 | Establish development lineage only; not 2025 advice | planned |
| bridge_2026_data | data_bridge | bridge_2024 | Separate data effects from method effects | planned |
| base_2026 | candidate_base | bridge_2026_data | September candidate | planned |
| base_2026_nov | final_candidate | base_2026 | November candidate | planned |
| retro_2026 | retrospective | base_2026_nov | Diagnostic | planned |
| profile_2026 | profile | base_2026_nov | Diagnostic | planned |
| mcmc_2026 | mcmc | base_2026_nov | Diagnostic | planned |
| projection_2026 | projection | base_2026_nov | OFL, maximum ABC, and scenarios | planned |
Current evidence limits
- Candidate 2025 inputs are located but still need provenance and suitability checks before assessment use.
- The exact September 2025 post-CIE source document and configuration remain to be confirmed and enumerated.
- The 2026 survey products and current-year catch snapshots remain pending or need confirmed delivery dates.
- The exact RTMB, close Rceattle, and near-exact SPoRC bridges use separately controlled comparisons; none establishes updated-data multi-model equivalence.
- The SPoRC bridge script, exact paired ADMB reference, checksums, and numerical tolerances remain pending for the August 25 review package.
- No September or November candidate, diagnostics package, projection result, OFL, or ABC recommendation is presented as complete on this page.
These limits are deliberate provenance controls. As records are validated, the dashboard and this overview will update from the same source tables.